Skip to content
Prime Base Engineering
  • Services
  • Costs & tools
  • Insights
  • Company
  • Contact
EN·বাংRequest a quote
  • Structural retrofitting
  • Detailed Engineering Assessment
  • Structural assessment & audit
  • Seismic retrofitting
  • Building strengthening
  • RMG factory assessment
  • NDT & concrete testing
  • Industrial building construction
  • Structural design & BOQ
See all services
  • Retrofitting company in BangladeshHow we run the whole job
  • Earthquake building safetyIs your building ready?
  • Areas we serveDhaka to Chattogram
  • Dhaka
  • Gazipur
  • Narayanganj
  • Savar & Ashulia
  • Chattogram
  • Narsingdi
  • Mymensingh
  • Quick budget calculatorFreeAll four kinds of work
  • Building construction costHouse, apartment, office, factory
  • PEB steel shed costPer sq ft, with cranes
  • Retrofitting costColumns, beams, footings
  • DEA costIncluding buyer and RSC
  • Prices and lab testsConcrete, steel and soil tests
  • Free guidesFreeChecklists to download
  • Building safety self-checkTwelve questions, one rating
  • Retrofit design to BOQSend a design, get a price
  • EstimatrixBD softwareOur BOQ and rate analysis app
  • All free tools
  • Building assessmentMost read
  • Cost & budgetingMost read
  • Design & estimation
  • Engineering in Bangladesh
  • Industrial construction
  • Infrastructure
  • Quality & compliance
  • Retrofitting
  • Seismic safety
Read all insights
  • All insightsNewest guides first
  • Search the site
  • About usWho we are
  • LeadershipThe people in charge
  • Methodology & complianceCodes and quality control
  • Project typesWhat we work on
  • CareersWork with us
  • ContactTalk to an engineer
Services
  • Structural retrofitting
  • Detailed Engineering Assessment
  • Structural assessment & audit
  • Seismic retrofitting
  • Building strengthening
  • RMG factory assessment
  • NDT & concrete testing
  • Industrial building construction
  • Structural design & BOQ
  • Retrofitting company in Bangladesh
  • Earthquake building safety
  • Areas we serve
Costs & tools
  • Quick budget calculatorFree
  • Building construction cost
  • PEB steel shed cost
  • Retrofitting cost
  • DEA cost
  • Prices and lab tests
  • Free guidesFree
  • Building safety self-check
  • Retrofit design to BOQ
  • EstimatrixBD software
  • All free tools
Insights
  • Building assessmentMost read
  • Cost & budgetingMost read
  • Design & estimation
  • Engineering in Bangladesh
  • Industrial construction
  • Infrastructure
  • Quality & compliance
  • Retrofitting
  • Seismic safety
  • All insights
  • Search the site
Company
  • About us
  • Leadership
  • Methodology & compliance
  • Project types
  • Careers
  • Contact
ContactEN·বাংRequest a quote
  1. Home
  2. /Insights
  3. /Cost & budgeting
  4. /DEA Cost in Bangladesh: What a Detailed Engineering Assessment Costs per Square Foot (2026)

DEA Cost in Bangladesh: What a Detailed Engineering Assessment Costs per Square Foot (2026)

A DEA fee has a fixed part that hardly changes with size and a rate per square foot that falls as the building grows. A 100,000 sq ft factory costs about Tk 4.7 lakh (Tk 6.3 lakh for buyer or RSC work); small buildings start at about Tk 3 lakh. Here is how the fee is worked out.

By Muhammad Sarowar Hossain, Founder & CEO. Published November 17, 2026. Updated November 23, 2026. 4 min read.

±0.00
Dense residential and commercial buildings of Dhaka under a cloudy sky
Photo: Mahmudul Hasan Roni on Unsplash

A Detailed Engineering Assessment (DEA) tells you what an existing building can safely carry. It is the document buyers, the RSC, banks and authorities ask for, and it is the starting point for any strengthening work. The first question owners ask is almost always the same: what will it cost?

This guide gives the price ranges used in Bangladesh's industrial sector in 2026, shows how the fee is worked out with real numbers, and explains what makes one building cost more than another.

The short answer: about Tk 4.7 lakh for a 100,000 sq ft factory (about Tk 6.3 lakh for buyer or RSC work), and rarely less than about Tk 3 lakh for a small building. Larger buildings cost less per square foot, because part of the fee is fixed.

In short

  • A DEA fee = a fixed part (testing, transport, field data, samples, lab work, analysis, report) + a rate per square foot of total floor area that falls as the building grows.
  • Small buildings have a minimum fee of about Tk 3 lakh, so they cost much more per square foot than large ones.
  • Typical 2026 figures: 100,000 sq ft about Tk 4.7 lakh; 250,000 sq ft about Tk 7.1 lakh; 500,000 sq ft about Tk 10.6 lakh.
  • Buyer and RSC assessments cost about a third more, for their report format, corrective action plan, review meetings and auditor follow-up.
  • Compare quotes by what they include (number of cores, NDT, analysis, report format), not by the headline price alone.

How the fee is calculated

Consultants price a DEA on the total floor area, not the plot or the footprint. Add every floor together. For a building with the same floor plate on every level:

Total floor area = ground-floor area x number of floors

The fee then has two parts:

  • A fixed part for the work that is much the same on any building: mobilising the team and testing equipment, transport, field data, sample collection, laboratory tests, setting up the analysis model and writing the report.
  • A rate per square foot for the survey, testing and checking that grows with the building. The rate falls as the building gets bigger: the first 50,000 sq ft cost more per sq ft than the next 100,000, and those more than the rest.

The purpose of the DEA then adjusts the total: buyer and RSC assessments cost about a third more, a RAJUK notice or an extension a little more.

Work out the fee for your own building, with its purpose, type and location, in our DEA cost calculator.

How a DEA fee is built

Four buildings, from small to very large: watch the fixed part stay put while the cost per square foot falls.

How a DEA fee is builtBar chart of DEA fees for buildings of 12,000, 100,000, 250,000 and 500,000 square feet, each bar split into a fixed part and an area part, with the minimum fee line and the per-square-foot rate falling as size grows.DEA fee, Tk lakh (2026 guide)minimum ≈ 33.012,0004.7100,0007.1250,00010.6500,000total floor area, sq ftfixed part1area part23Tk 25 / sq ftTk 2 / sq ft49.6 for buyer / RSC5

Worked examples

Building (Gazipur or Narayanganj)Total floor areaGeneral DEABuyer or RSC DEA
Small 2-storey workshop, 6,000 sq ft per floor12,000 sq ftAbout Tk 3.0 lakh (minimum)About Tk 4.1 lakh
Garment factory, 20,000 sq ft per floor, 5 floors100,000 sq ftAbout Tk 4.7 lakhAbout Tk 6.3 lakh
Factory, 50,000 sq ft per floor, 5 floors250,000 sq ftAbout Tk 7.1 lakhAbout Tk 9.6 lakh
Large complex, 100,000 sq ft per floor, 5 floors500,000 sq ftAbout Tk 10.6 lakhAbout Tk 14.3 lakh

These are first budgets for 2026, before VAT; each is likely within about 6% either way. Sites outside Dhaka division add travel. A written quote follows a look at the building and its documents.

Why there is a minimum fee

Some parts of a DEA cost almost the same whatever the size of the building: mobilising the survey team and testing equipment, setting up the analysis model, checking the foundations and soil information, writing and reviewing the report. On a small building the per-square-foot rate does not cover that fixed work, so consultants set a floor. In 2026 a complete DEA is rarely done for less than about Tk 3 lakh, or about Tk 4 lakh for buyer or RSC work.

What moves the fee up or down

FactorLower feeHigher fee
DrawingsReliable structural drawings existNo drawings: a full as-built survey is needed
StructureRegular grid, repeated floorsIrregular layout, extensions, mixed RCC and steel
TestingUniform concrete, standard samplingWide variation, so more cores and NDT locations
Soil informationA reliable soil report existsNew boreholes needed
AccessFree access during the dayWork around production, at night or on holidays
LocationDhaka, Gazipur, NarayanganjRemote districts, with travel and stay

What a complete DEA quote should include

  1. As-built survey: grids, member sizes, slab thicknesses, storey heights, and as-built drawings if none exist.
  2. Material testing: a stated number of concrete cores, plus rebound hammer, ultrasonic pulse velocity and ferro-scan readings. See what concrete tests cost.
  3. Load survey: machinery, storage, generators and water tanks as they are today.
  4. Foundation and soil review, and whether new boreholes are included.
  5. 3D analysis to BNBC 2020, with every member checked.
  6. Report in the format your buyer, auditor or authority needs, with a corrective action plan and strengthening options.

If a quote does not say how many cores and test locations it includes, ask before you sign. That number is the biggest difference between a cheap DEA and a reliable one.

Costs that are usually separate

  • New soil investigation. Boreholes are billed separately when no reliable soil report exists, usually at least three per site. See our testing price list.
  • Extra testing beyond the agreed plan, if early results show wide variation.
  • Strengthening design. If the DEA finds deficiencies, the retrofit design is a separate stage. See what retrofitting costs.
  • VAT and tax. Check whether a quote includes VAT and AIT.

How long it takes

A mid-sized factory usually takes 4 to 8 weeks from site survey to final report; laboratory results for cores are often the longest step. More in how long a DEA takes.

Comparing DEA quotes

  • Put the quotes side by side on the same items: number of cores, NDT locations, soil work, report format and timeline.
  • Ask who reviews the analysis. A second engineer checking the calculations is good practice.
  • Ask for a sample report table of contents, with client details removed.
  • Be careful with a quote far below the figures above: something, usually testing, has been left out.

Getting a quote

Send us the ground-floor area, number of floors, building use, location and any drawings you have. We reply with a written, itemised fee and testing plan. Ask for a DEA quote.

Topics:DEAcostdetailed engineering assessmentfactoryBangladesh

Frequently asked questions

How much does a DEA cost per square foot in Bangladesh?+

It depends on size, because part of the fee is fixed. In 2026 a 100,000 sq ft factory works out at about Tk 4.7 per sq ft, a 250,000 sq ft factory about Tk 2.8 and a 10,000 sq ft building about Tk 30, because the minimum fee applies. Buyer and RSC work costs about a third more.

What is the minimum fee for a DEA?+

About Tk 3 lakh for a general assessment and about Tk 4 lakh for buyer or RSC work. Testing, transport, field data, samples, lab work and the report cost much the same on a small building as on a large one.

How is the floor area for a DEA calculated?+

Add up all floors. For a building of the same size on every floor, multiply the ground-floor area by the number of floors: 20,000 sq ft x 5 floors = 100,000 sq ft.

Does the DEA fee include laboratory tests?+

Usually the main tests are included, but the number of cores and NDT readings varies between quotes. Ask each consultant how many cores, rebound hammer and ferro-scan locations are included, and how extra tests are charged.

Why do DEA quotes differ so much?+

Mostly because of testing. A very cheap quote often means fewer cores and readings, which makes the conclusions less reliable and can lead to buyers or auditors asking for more work later.

About Muhammad Sarowar Hossain

Founder & CEO, Prime Base Engineering, B.Sc. in Civil Engineering, PGDSCM-ISCEA. Muhammad Sarowar Hossain founded Prime Base Engineering and leads its structural assessment, retrofitting and construction work. He has worked on structural retrofitting of factories and industrial buildings across Bangladesh since 2017.

One email a month with new articles

Assessment, retrofitting and construction guidance. Unsubscribe at any time.

On this page

  1. How the fee is calculated
  2. Worked examples
  3. Why there is a minimum fee
  4. What moves the fee up or down
  5. What a complete DEA quote should include
  6. Costs that are usually separate
  7. How long it takes
  8. Comparing DEA quotes
  9. Getting a quote

Read next

  • Concrete Test Cost in Bangladesh: Core, Rebound Hammer and Ferro-scan Prices (2026)
  • PEB Steel vs RCC for Factories in Bangladesh: Cost, Speed and Performance Compared
  • How to Plan an Industrial Construction Budget in Bangladesh: 7 Steps

Tell us about the building.

Send drawings, photographs or earlier reports. An engineer will reply with what investigation is needed and a proposal.

Book a consultationRequest a quote
Prime Base Engineering

Structural assessment, retrofitting and industrial construction across Bangladesh, engineered to BNBC 2020.

+88 016-13 682222[email protected]Dhaka, Bangladesh

Services

  • Structural retrofitting
  • Detailed Engineering Assessment
  • Structural assessment & audit
  • Seismic retrofitting
  • Building strengthening
  • All services

Explore

  • Earthquake safety
  • Areas we serve
  • Free guides
  • Careers
  • Free tools

Occasional updates, no spam

New articles and guides, about once a month.

Follow us

© 2026 Prime Base Engineering. All rights reserved.

Privacy PolicyTerms of UseCookie PolicyBack to top
Call WhatsApp an engineer