Articles about factory
5 articles from our engineers.
- DEA Cost in Bangladesh: What a Detailed Engineering Assessment Costs per Square Foot (2026)A DEA fee has a fixed part that hardly changes with size and a rate per square foot that falls as the building grows. A 100,000 sq ft factory costs about Tk 4.7 lakh (Tk 6.3 lakh for buyer or RSC work); small buildings start at about Tk 3 lakh. Here is how the fee is worked out.Cost & budgeting, 4 min read
- PEB Steel vs RCC for Factories in Bangladesh: Cost, Speed and Performance ComparedFor a single-storey production hall a PEB is usually cheaper and much faster; from three storeys up, or with heavy floors and long fire ratings, RCC usually wins. Here is why, and how to compare the two for your own site.Cost & budgeting, 5 min read
- How to Plan an Industrial Construction Budget in Bangladesh: 7 StepsIndustrial projects rarely overrun because of one big mistake; they overrun through many small omissions. This 7-step method builds a factory budget that catches them early.Cost & budgeting, 3 min read
- Soil Investigation Before Factory Construction: Why It Pays for ItselfThe ground decides the foundation, and the foundation can decide the budget. Here is what a soil investigation for a factory covers, how many boreholes you need, and why skipping it is the most expensive saving an owner can make.Industrial construction, 3 min read
- Pre-Engineered Building (PEB) Components Explained: What to Check in EachTwo PEB quotations with different prices may describe two different buildings. Here are the main components of a pre-engineered steel building, what each does, and what to check before you compare offers.Industrial construction, 2 min read