Articles about detailed engineering assessment
2 articles from our engineers.
- DEA Cost in Bangladesh: What a Detailed Engineering Assessment Costs per Square Foot (2026)A DEA fee has a fixed part that hardly changes with size and a rate per square foot that falls as the building grows. A 100,000 sq ft factory costs about Tk 4.7 lakh (Tk 6.3 lakh for buyer or RSC work); small buildings start at about Tk 3 lakh. Here is how the fee is worked out.Cost & budgeting, 4 min read
- What Is a Detailed Engineering Assessment (DEA), and When Do You Need One?A DEA tells you what an existing building can safely carry: engineers survey it, test the concrete and steel, analyse the structure to BNBC 2020 and give a clear verdict member by member. Here is how it works and when you need one.Retrofitting, 3 min read