PEB steel building cost calculator
The whole-building cost of a pre-engineered steel shed, warehouse or factory: steel frame, cladding, foundations, floor slab and erection, with mezzanines and cranes.
Most likely budget
৳ 9.1 crore
Likely between ৳ 8.65 – 9.56 crore · Total floor area: 60,000 sq ft
A guide only, not an exact quote.
About Tk 1,550 per sq ft
- Steel frame and cladding55%
- Foundations and floor slab32%
- Erection, doors and others13%
Indicative 2026 rates: steel frame, cladding, foundations, floor slab and erection. Excludes land, utilities, approvals, VAT and AIT.
Typical PEB building costs in 2026
| Project | Total floor area | Per sq ft | Most likely budget |
|---|---|---|---|
| Warehouse, 20,000 sq ft, 8 m eave | 20,000 sq ft | ৳ 1,350 | ৳ 2.7 crore |
| Factory, 30,000 sq ft, 10 m eave, 10 t crane | 30,000 sq ft | ৳ 1,823 | ৳ 5.47 crore |
| Factory, 50,000 sq ft, 12 m eave, 30 t + 5 t cranes | 50,000 sq ft | ৳ 2,192 | ৳ 11 crore |
| Factory, 20,000 sq ft, two mezzanines at 50% | 40,000 sq ft | ৳ 1,375 | ৳ 5.5 crore |
| Showroom, 10,000 sq ft, one full mezzanine | 20,000 sq ft | ৳ 1,645 | ৳ 3.29 crore |
A guide only, not an exact quote. 2026 rates; VAT and AIT extra.
What changes a PEB shed rate
- Eave height
- Taller columns and more wall cladding: a 12 m shed is about 15% more per sq ft than an 8 m shed.
- Cranes
- Overhead cranes need heavier columns, runway beams and deeper foundations: from about 6% more for 5 t to about 30% for 50 t. A second crane adds half its own premium. Crane machinery is extra.
- Mezzanines and floors
- Each mezzanine level adds about Tk 1,200 per sq ft of its own area; full upper steel floors about Tk 1,500.
- Steel price
- Steel is over half the cost, so the steel market moves the total most.
Questions owners ask
What is the PEB shed rate per sq ft in Bangladesh?
For a complete building (frame, cladding, foundations, floor slab and erection) it is about Tk 1,350 per sq ft for a warehouse, Tk 1,550 for a factory and Tk 1,900 for a showroom at an 8 m eave in 2026. Frame-only supply is much lower, which is why quotes differ.
How much does a crane add to a steel building?
About 6% for a 5 t crane, 10% for 10 t, 20% for 30 t and 30% for 50 t on the shed rate, for the heavier frame, runway beams and foundations.
Is PEB cheaper than an RCC building?
For single-storey sheds with wide spans, yes, and it is built faster. For multi-storey buildings RCC is usually cheaper per sq ft.
Does the figure include the floor slab and foundations?
Yes. Land, utilities, approvals, VAT and AIT are not included.
Is this a quotation?
No, it is a guide. Ask for a custom BOQ and budget for your shed.
Tell us about the building.
Send drawings, photographs or earlier reports. An engineer will reply with what investigation is needed and a proposal.