DEA cost calculator for Bangladesh
The likely fee for a Detailed Engineering Assessment of your building, from its floor area, purpose and location. Small buildings cost more per sq ft, because testing, transport and the report cost much the same at any size.
Report in the buyer or RSC format with a corrective action plan; review meetings and auditor follow-up are included, so it costs more.
Most likely budget
৳ 6.3 lakh
Likely between ৳ 6 – 6.7 lakh · Total floor area: 1,00,000 sq ft
A guide only, not an exact quote.
About Tk 6 per sq ft
A first budget, excluding VAT, with travel for sites outside Dhaka. We confirm the fee in writing after seeing the building.
Typical DEA fees in 2026
| Project | Total floor area | Per sq ft | Most likely budget |
|---|---|---|---|
| Small factory, 10,000 sq ft, general safety | 10,000 sq ft | ৳ 30 | ৳ 3 lakh |
| Small factory, 10,000 sq ft, buyer or RSC | 10,000 sq ft | ৳ 41 | ৳ 4.1 lakh |
| Factory, 100,000 sq ft in all, buyer or RSC | 1,00,000 sq ft | ৳ 6 | ৳ 6.3 lakh |
| Apartment building, 30,000 sq ft, extra floors | 30,000 sq ft | ৳ 12 | ৳ 3.7 lakh |
| Large factory, 300,000 sq ft in all, buyer or RSC | 3,00,000 sq ft | ৳ 4 | ৳ 10.5 lakh |
A guide only, not an exact quote. 2026 rates; VAT and AIT extra.
What sets a DEA fee
- Fixed costs
- Mobilisation, the as-built survey set-up, core cutting and lab tests, rebar scanning, the analysis model and the report. These barely change between 10,000 and 1,000,000 sq ft, so a small building has a higher fee per sq ft.
- Floor area
- More floors and more area mean more survey days, more samples and a bigger model, but each extra sq ft costs less than the one before.
- Purpose
- Buyer and RSC assessments cost more: their report format, a corrective action plan, review meetings and auditor follow-up. A RAJUK notice or an extension needs extra checks too.
- Location
- Sites outside Dhaka division add travel and lodging for the survey and testing team.
Questions owners ask
How much does a DEA cost in Bangladesh?
For most factories the fee is between about Tk 3 lakh and Tk 25 lakh. A 10,000 sq ft building costs about Tk 3 lakh for a general assessment and about Tk 4 lakh for a buyer or RSC assessment; a 100,000 sq ft factory costs about Tk 4.7 to 6.3 lakh. Use the calculator above for your building.
Why is the fee per sq ft higher for a small building?
Testing, transport, field data, sample collection, lab tests and the report cost much the same whether the building is 10,000 or 1,000,000 sq ft. On a small building these fixed costs are shared by fewer sq ft.
Does the fee include lab tests?
Yes, the usual set of concrete cores, rebar scanning and rebound hammer tests for a DEA is included. Extra tests the engineer asks for later, such as a new soil test or a plate load test, are priced from our test price list.
How long does a DEA take?
Most factory DEAs take four to eight weeks from the site survey to the final report, depending on size and how quickly drawings and test results come in.
Is this figure a quotation?
No. It is a guide for budgeting. We confirm the fee in writing after seeing the building and its drawings.
Tell us about the building.
Send drawings, photographs or earlier reports. An engineer will reply with what investigation is needed and a proposal.