Have a retrofit design? Get a detailed BOQ.
Retrofitting has no fixed price, so we price your design item by item. Tell us what you have and we will show you the next step.
What do you have right now?
How it works
- 1Send the designDrawings, specifications and the DEA or design report, by link or by email.
- 2We measure every itemQuantities taken from your drawings: surface preparation, dowels, rebar, concrete, CFRP, steel, propping.
- 3You receive the BOQ and quoteItemised BOQ at current market rates, a programme and method statements for each technique.
- 4We build itPhased works with quality control at every hold point and a completion report at the end.
What you receive
- An itemised bill of quantities that follows your drawings line by line
- Rate analysis for the main items, so you can check every price
- A programme, phased around production or occupancy
- Method statements for jacketing, CFRP, steel or new walls
- Notes on anything missing or unclear in the design
Questions owners ask
Can you execute a retrofit design made by another consultant?
Yes. We build to the designer's drawings and specifications, and raise any question with the designer before work starts. The design responsibility stays with the consultant who signed it.
How long does a BOQ take?
For a typical building, 5 to 7 working days from receiving complete drawings. Large or complex schemes take longer; we tell you the date when we receive the design.
Do I have to award you the work after getting the BOQ?
No. The BOQ is yours to use, for example to compare contractors' prices on the same quantities.
Can I prepare the BOQ myself?
Yes. EstimatrixBD, our BOQ and rate-analysis software built on the PWD Schedule of Rates, lets you prepare it yourself.
What file formats do you accept?
PDF and DWG drawings, Word or PDF specifications and reports. Share a Google Drive or Dropbox link, or reply to our confirmation email with attachments.
Tell us about the building.
Send drawings, photographs or earlier reports. An engineer will reply with what investigation is needed and a proposal.