Skip to content
Prime Base Engineering
  • Services
  • Costs & tools
  • Insights
  • Company
  • Contact
EN·বাংRequest a quote
  • Structural retrofitting
  • Detailed Engineering Assessment
  • Structural assessment & audit
  • Seismic retrofitting
  • Building strengthening
  • RMG factory assessment
  • NDT & concrete testing
  • Industrial building construction
  • Structural design & BOQ
See all services
  • Retrofitting company in BangladeshHow we run the whole job
  • Earthquake building safetyIs your building ready?
  • Areas we serveDhaka to Chattogram
  • Dhaka
  • Gazipur
  • Narayanganj
  • Savar & Ashulia
  • Chattogram
  • Narsingdi
  • Mymensingh
  • Quick budget calculatorFreeAll four kinds of work
  • Building construction costHouse, apartment, office, factory
  • PEB steel shed costPer sq ft, with cranes
  • Retrofitting costColumns, beams, footings
  • DEA costIncluding buyer and RSC
  • Prices and lab testsConcrete, steel and soil tests
  • Free guidesFreeChecklists to download
  • Building safety self-checkTwelve questions, one rating
  • Retrofit design to BOQSend a design, get a price
  • EstimatrixBD softwareOur BOQ and rate analysis app
  • All free tools
  • Building assessmentMost read
  • Cost & budgetingMost read
  • Design & estimation
  • Engineering in Bangladesh
  • Industrial construction
  • Infrastructure
  • Quality & compliance
  • Retrofitting
  • Seismic safety
Read all insights
  • All insightsNewest guides first
  • Search the site
  • About usWho we are
  • LeadershipThe people in charge
  • Methodology & complianceCodes and quality control
  • Project typesWhat we work on
  • CareersWork with us
  • ContactTalk to an engineer
Services
  • Structural retrofitting
  • Detailed Engineering Assessment
  • Structural assessment & audit
  • Seismic retrofitting
  • Building strengthening
  • RMG factory assessment
  • NDT & concrete testing
  • Industrial building construction
  • Structural design & BOQ
  • Retrofitting company in Bangladesh
  • Earthquake building safety
  • Areas we serve
Costs & tools
  • Quick budget calculatorFree
  • Building construction cost
  • PEB steel shed cost
  • Retrofitting cost
  • DEA cost
  • Prices and lab tests
  • Free guidesFree
  • Building safety self-check
  • Retrofit design to BOQ
  • EstimatrixBD software
  • All free tools
Insights
  • Building assessmentMost read
  • Cost & budgetingMost read
  • Design & estimation
  • Engineering in Bangladesh
  • Industrial construction
  • Infrastructure
  • Quality & compliance
  • Retrofitting
  • Seismic safety
  • All insights
  • Search the site
Company
  • About us
  • Leadership
  • Methodology & compliance
  • Project types
  • Careers
  • Contact
ContactEN·বাংRequest a quote
  1. Home
  2. /Insights
  3. /Cost & budgeting
  4. /Concrete Test Cost in Bangladesh: Core, Rebound Hammer and Ferro-scan Prices (2026)

Concrete Test Cost in Bangladesh: Core, Rebound Hammer and Ferro-scan Prices (2026)

What concrete core tests, rebound hammer tests, ferro-scanning, cylinder, rebar and soil tests cost in Bangladesh in 2026, with our price list and a sample budget for a five-storey building.

By Muhammad Sarowar Hossain, Founder & CEO. Published November 17, 2026. Updated November 23, 2026. 2 min read.

±0.00
Hands holding a digital testing meter over fresh concrete on a construction site
Photo: Betong SMC SG on Pexels

Concrete tests tell engineers what is really inside a building: how strong the concrete is, where the reinforcement sits and whether the steel is corroding. They are the backbone of any Detailed Engineering Assessment or structural audit. Owners planning an assessment often want to know what the testing alone will cost.

Below are our standard 2026 prices, a guide to what each test tells you, and a sample budget for a typical building. Prices include 15% VAT.

Prices

Testing price list

TestUnitPrice (Tk)
Concrete strength
In-situ concrete core with scanning first (avoids rebar)per core, min. 319,000
In-situ concrete core: cutting and testingper core, min. 39,300
Core supplied to the laboratoryper core4,400
Concrete cylinders 150 x 300 mmset of 36,000
Concrete cylinders 100 x 200 mmset of 33,300
Concrete cubes under 200 mmset of 35,000
Concrete cubes 200 to 300 mmset of 36,000
Concrete beam in flexureset of 313,200
Concrete mix design, without admixtureper design97,900
Concrete mix design, with admixtureper design1,08,400
Non-destructive tests on site
Ferro-scan (rebar location, spacing and cover)per location, 2 scans18,500
Rebound (Schmidt) hammer testper location, min. 39,300
Windsor probe (penetration) testper location, min. 38,600
Reinforcing steel and structural steel
Rebar tensile test up to 25 mm (with weight and elongation)set of 33,300
Rebar tensile test, above 25 mm up to 32 mmset of 34,900
Rebar tensile test, above 32 mm up to 50 mmset of 36,000
Rebar bend test, up to 25 mmset of 31,600
Rebar re-bend test, up to 25 mmset of 32,200
Mechanical coupler tension testset of 39,900
Bolt tension test, up to 25 mmset of 35,300
Anchor bolt tension test, up to 25 mmset of 37,700
Steel plate or angle tension test, up to 16 mmset of 36,900
Butt-welded joint testper sample10,700
Cement
Compressive strength at 3, 7 and 28 days (ASTM)per sample16,400
Compressive strength at 2 and 28 days (EN)per sample39,700
Fineness with densityper sample10,600
Initial and final setting timeper sample6,900
Normal consistencyper sample4,200
Soundnessper sample15,900
Sand, stone and brick chips
Sample preparation (charged once per sample)per sample2,600
Sand: sieve analysis and fineness modulus (FM)per sample5,600
Silt or fine content (finer than No. 200)per sample5,600
Coarse aggregate: sieve analysis and gradationper sample9,900
Aggregate crushing value (ACV)per sample11,200
Aggregate impact value (AIV)per sample9,800
Los Angeles abrasionper sample11,200
Specific gravity and absorptionper sample9,900
Unit weight of coarse aggregateper sample7,300
Flakiness indexper sample11,600
Elongation indexper sample12,700
Organic impurities, salt or sulphateper sample6,600
Bricks and blocks
Brick crushing strength (ASTM)set of 57,300
Brick water absorption (ASTM)set of 53,300
Brick size and shapeset of 56,600
Brick unit weightset of 55,700
Efflorescenceset of 57,300
Hollow block or paving block compressive strengthset of 35,300
Soil investigation and laboratory soil tests
Soil boring with SPT and standard tests, up to 20 m (inside Dhaka)per borehole, min. 31,05,800
Soil boring with SPT and standard tests, up to 25 m (inside Dhaka)per borehole, min. 31,32,300
Soil boring with SPT and standard tests, up to 30 m (inside Dhaka)per borehole, min. 31,78,500
Atterberg limits (liquid and plastic limit)per sample6,600
Grain size: sieve and hydrometerper sample9,300
Unconfined compression testper sample13,200
One-dimensional consolidationper sample31,700
Triaxial test, unconsolidated undrained (UU)per sample31,700
Standard Proctor compactionper sample19,800
Modified Proctor compactionper sample26,500
Laboratory CBRper sample39,700
Load tests and field tests
Plate load testper location1,28,300
Static pile load test (axial capacity)per pile, min. Tk 1.35 lakh in Dhaka1,41,500
Pile integrity test (PIT)per pile, min. Tk 75,000 in Dhaka4,000
Field CBRper location52,900
Field density (sand cone)per spot10,600
Site visit for field tests
Inside Dhaka cityper visit26,500
Nearby districts (Gazipur, Narayanganj, Savar and similar)per visit52,900
Distant districts (same-day return)per visit79,400

Priced on request: Ultrasonic pulse velocity (UPV), Half-cell potential (corrosion mapping), Carbonation depth, Chloride content.

Prices in Taka, including 15% VAT. Valid for 2026; a written quote confirms the number of tests, locations and site visits for your building.

In short

  • A concrete core is the most reliable measure of in-place strength; scanning before coring costs more but avoids cutting through rebar.
  • Rebound hammer and ferro-scan tests are priced per location and cover the building quickly, but must be calibrated against cores.
  • Site visits are charged per visit, so grouping all field tests into one or two visits saves money.
  • A five-storey building typically needs around 10 cores, 15 rebound hammer locations and 10 scan locations; the exact plan depends on the building.
  • The number of tests is set by a testing plan, not by budget alone: too few tests make any assessment unreliable.

What each test tells you

TestWhat it measuresWhen it is used
Concrete coreTrue compressive strength of the concrete in placeEvery assessment; also calibrates the faster tests
Rebound hammerSurface hardness, a guide to relative strengthMany locations quickly, to find weak zones
Ferro-scanPosition, spacing and cover of reinforcementChecking drawings, or finding the steel when there are none
Cylinders and cubesStrength of concrete as castQuality control on new construction
Rebar tensile testYield strength, tensile strength, elongationChecking the grade of steel used
Soil boringSoil layers, strength and water tableNew foundations, extra floors, settlement problems

More detail in reading core test results, rebound hammer and UPV tests and our overview of NDT for concrete buildings.

Three tests, one column: what you pay for

A column cut open to show what each test sees, and a sample plan for a five-storey building.

Three tests, one column: what you pay forA concrete column in section with reinforcement bars, a ferro-scanner finding the bars, a core drilled between them, rebound hammer test points on the surface, one site visit and a five-storey building with its testing plan.column, 300 × 300 mmbars located,cover measured1crushed in the lab2surface hardness, calibrate with cores3all field tests, one visit45 storeys10 cores15 hammer10 scans5

A sample testing budget

An illustration for a five-storey RCC building in Dhaka. The real plan depends on the building and is set by the engineer.

ItemQuantityApproximate cost (Tk)
Core with scanning first10 (2 per floor)190,000
Rebound hammer locations15 (3 per floor)139,500
Ferro-scan locations10 (2 per floor)185,000
Rebar tensile tests2 sets6,600
Site visits inside Dhaka253,000
Totalabout 5.7 lakh

When testing is part of a full Detailed Engineering Assessment, the testing plan is usually included in the DEA fee, so check what a DEA quote covers before budgeting for tests separately.

How to keep testing costs down

  • Group the field work. Every site visit is charged, so plan all cores, scans and hammer tests for one or two visits.
  • Share the drawings. Good drawings reduce the scanning needed to find the reinforcement.
  • Test smart, not less. Fast tests across the building plus a few well-placed cores give a reliable picture at the lowest cost.

Testing is not the whole assessment

Test results are raw data. They become useful only when an engineer feeds them into an analysis of the whole structure and checks every member against BNBC 2020. That is the difference between a test report and a Detailed Engineering Assessment.

Need a testing plan?

Tell us the building's size, number of floors and use. We will set out which tests are needed, how many and where, with a written quote. Ask for a testing plan.

Topics:concrete testingcore testrebound hammerNDTcost

Frequently asked questions

How much does a concrete core test cost in Bangladesh?+

Prices for an in-situ core, cut and tested, are in the table in this article, including VAT. A core with scanning first costs about twice as much, and each site visit is charged separately.

How much does a rebound hammer test cost?+

It is priced per location, with at least three readings at each, plus the site visit. See the price table in this article.

Why do I need cores if rebound hammer tests are cheaper?+

Rebound hammer readings only measure surface hardness and can be misleading on their own. A few cores give the true strength and are used to calibrate the faster tests across the whole building.

Are these prices fixed?+

They are our standard 2026 prices. The written quote for your building confirms the number of tests, locations and site visits.

How many tests does a building need?+

It depends on its size, number of floors and how uniform the concrete is. A testing plan sets out cores, rebound hammer and scanning locations for each floor and element type before work starts.

About Muhammad Sarowar Hossain

Founder & CEO, Prime Base Engineering, B.Sc. in Civil Engineering, PGDSCM-ISCEA. Muhammad Sarowar Hossain founded Prime Base Engineering and leads its structural assessment, retrofitting and construction work. He has worked on structural retrofitting of factories and industrial buildings across Bangladesh since 2017.

One email a month with new articles

Assessment, retrofitting and construction guidance. Unsubscribe at any time.

On this page

  1. What each test tells you
  2. A sample testing budget
  3. How to keep testing costs down
  4. Testing is not the whole assessment
  5. Need a testing plan?

Read next

  • DEA Cost in Bangladesh: What a Detailed Engineering Assessment Costs per Square Foot (2026)
  • PEB Steel vs RCC for Factories in Bangladesh: Cost, Speed and Performance Compared
  • How to Plan an Industrial Construction Budget in Bangladesh: 7 Steps

Tell us about the building.

Send drawings, photographs or earlier reports. An engineer will reply with what investigation is needed and a proposal.

Book a consultationRequest a quote
Prime Base Engineering

Structural assessment, retrofitting and industrial construction across Bangladesh, engineered to BNBC 2020.

+88 016-13 682222[email protected]Dhaka, Bangladesh

Services

  • Structural retrofitting
  • Detailed Engineering Assessment
  • Structural assessment & audit
  • Seismic retrofitting
  • Building strengthening
  • All services

Explore

  • Earthquake safety
  • Areas we serve
  • Free guides
  • Careers
  • Free tools

Occasional updates, no spam

New articles and guides, about once a month.

Follow us

© 2026 Prime Base Engineering. All rights reserved.

Privacy PolicyTerms of UseCookie PolicyBack to top
Call WhatsApp an engineer