Articles about DEA
3 articles from our engineers.
- DEA Cost in Bangladesh: What a Detailed Engineering Assessment Costs per Square Foot (2026)A DEA fee has a fixed part that hardly changes with size and a rate per square foot that falls as the building grows. A 100,000 sq ft factory costs about Tk 4.7 lakh (Tk 6.3 lakh for buyer or RSC work); small buildings start at about Tk 3 lakh. Here is how the fee is worked out.Cost & budgeting, 4 min read
- What Is a Detailed Engineering Assessment (DEA), and When Do You Need One?A DEA tells you what an existing building can safely carry: engineers survey it, test the concrete and steel, analyse the structure to BNBC 2020 and give a clear verdict member by member. Here is how it works and when you need one.Retrofitting, 3 min read
- RMG Factory Structural Safety in Bangladesh: Lessons from Rana Plaza, the Accord and RSCRana Plaza changed how Bangladesh treats structural safety in garment factories. Here is what went wrong, how the inspection programmes and the RSC work, and the engineering lessons that apply to every factory today.Seismic safety, 2 min read